
D10 · GCB
Staircase renovation in Namly is the most ambitious in Singapore by typical scope. Owners treat the staircase as a major architectural feature with multi-storey visibility from the entrance, and brief designers for sculptural rather than just functional outcomes. Custom-fabricated steel stringers, premium timber or stone treads, frameless glass balustrades, and elaborate LED integration form the baseline package.
Why Namly
Structural rework is common — owners frequently want to widen treads, reduce riser heights, change flight direction, or open up the void above the staircase to make the feature more visible across multiple storeys. Engineer involvement is standard. Material selections include rare or specialist timbers, custom-cut stone, and bronze or brushed-steel fabrications.
Top-of-band scope here. Custom-fabricated structural elements, premium materials, full LED integration, and frequent structural rework are common. We scope each staircase after a free site assessment.
A home off Namly Drive rebuilt its central staircase as a sculptural three-storey feature with custom matte-black steel stringers, statuary marble treads, frameless glass balustrades on bronze standoffs, and a pendant chandelier hung in the reworked void above. 7 weeks on-site.
Common Questions
The cost depends on the materials (timber overlay, natural stone, or a full structural redesign with glass balustrades and custom metalwork), the size of your staircase, and the complexity of the work. We provide a tailored quote after a free design consultation.
Timber is warm, quieter underfoot, and suits most interior styles. Marble is more durable, cooler (pleasant in Singapore), and suits grander homes. Timber needs re-sealing every 3–5 years; marble needs sealing and can be slippery when wet. Both are excellent choices for different aesthetics.
The cost depends on the glass type (tempered vs laminated), the mounting system (point-fixed, channel, or standoff), and the total length of railing required. We provide a tailored quote after a free design consultation.
A tread overlay with new railings typically takes 2–3 weeks. Full structural redesigns may take 4–6 weeks. We stage work to maintain access between floors throughout.
An open riser staircase has no vertical boards between treads, creating a light, modern look that allows light to pass through. They're popular in contemporary landed homes. Building code requires gaps under 100mm for child safety, which we achieve with glass or metal infill panels.
Yes, but structural changes to the staircase layout require engineering approval. We handle the full process including structural calculations and submissions.
Have a different question? See the full Staircase Renovation guide or WhatsApp us.
Get Started
Tell us about your staircase renovation project in Namly. We'll arrange a free site assessment and provide a detailed, no-obligation quotation.
Also Serving