Walls, tiles, kitchens, toilets and built-ins taken out of your home or unit

Hacking and Demolition

Get walls, tiles, a kitchen, a toilet or built-ins hacked out of your condo, house, office or shop by our specialist, with one contractor arranging and supervising the job. After a free site assessment, we send a fixed-price quote within 3 to 5 working days, never from a photo, and arrange an engineer where a wall may be structural.

Why Choose Us

What You Get

A fixed price after a free site assessment

We visit, measure and go through exactly what you want taken out, then send a fixed-price quote within 3 to 5 working days, never from a photo. The quote states how the debris is cleared. Have your estate's renovation guidelines or your landlord's rules ready, so the quote allows for what they ask for, such as how the lift and corridors are protected.

One contractor arranging and supervising the job

Our specialist does the hacking, and we arrange and supervise the job from the site visit to handover. If new tiles, flooring or painting follow, we arrange those specialists too, so you aren't lining up several firms around your building's working hours.

An engineer arranged where a wall may be structural

Structural works need an approved structural plan and a permit before they start, the Building and Construction Authority (BCA) says, and only a Professional Engineer in the civil or structural discipline can apply for that approval. Where a wall may be structural, or your estate asks for an engineer's endorsement, we arrange the Professional Engineer. The assessment and the structural plan application are the engineer's.

A walk-through before handover

We walk the space with you before handover, checking what was taken out against the quote and that any shared corridor and lift are left clean. The work comes with our warranty and after-care.

Landed, condo or commercial

For your kind of property

Landed homes

Get tiles, a kitchen, toilets or built-ins taken out of your landed house, and if you want a wall removed that may be structural, we arrange a Professional Engineer to assess it first. Singapore's planning and building authorities advise, in their guide for landed homes, that generally there should be no hacking of a shared party wall to create a recess for new walls, columns or beams.

Condos

In a condo, building works might need your management corporation's (MCST) approval, and its renovation guidelines can set the hours and how the lift is protected. BCA has advised estates to ask for an engineer's endorsement before demolition other than floor tiles, so yours may ask for one, and we arrange the engineer. The approval is yours to apply for, and we give you the details the estate's form asks about.

Shops, offices and factories

In a rented unit, your lease and your landlord's rules say what can come out, when the work can be done and what goes back at the end of the lease. If you lease from JTC, the government agency that leases industrial land and space, you're required to reinstate the premises before returning them on the lease expiry date. Send us the lease clause and your landlord's list, and we quote for taking out what has to go.

How It Works

Our Process

01

Free site assessment

We visit, measure and go through what you want taken out, such as walls, floor or wall tiles, a kitchen, a toilet, built-ins or a false ceiling. We note any wall that may be structural and anything your estate's or landlord's rules ask for. Have those rules, your floor plan and, in a rented unit, your lease ready if you can.

02

Get a fixed-price quote

We send a fixed-price quote within 3 to 5 working days of the site assessment, never from a photo, and it states how the debris is cleared. Check that it also covers what comes out and to what depth, the protection for floors, lifts and corridors, the making good afterwards and any engineer the job needs, so none of them turns up later as an extra.

03

Approvals before work starts

Your estate's or landlord's approval is yours to apply for, and we give you the scope and the details of the work their forms ask about. Where a wall may be structural or your estate asks for an engineer's endorsement, we arrange the Professional Engineer, and the structural plan application is the engineer's. Work starts once the approvals your job needs are in.

04

Our specialist does the hacking, and we supervise

Our specialist covers what stays, then takes out what the quote lists, inside the working hours your estate or landlord sets. We supervise throughout. If pipes, cables or anything else outside the quote turns up, it's shown to you and agreed before anything changes.

05

Clear the debris and hand over

The debris is cleared the way the quote states. We walk the space with you, checking what was taken out against the quote and that any shared corridor and lift are left clean, and the work comes with our warranty and after-care.

From assessment to handover

Plan each stage around your home or unit

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Hacking and Demolition FAQ

What decides the cost of a hacking job?
What comes out, how deep it goes and how the debris leaves the building. Floor tiles alone cost less to take up than tiles with the cement bed under them, and a brick wall is more work than a board partition. A kitchen or toilet adds cabinets, fittings and wall tiles. Then add the protection your estate or landlord asks for in the lift and corridors, the making good afterwards, and any engineer's endorsement where a wall may be structural. A quote that leaves any of these out isn't cheaper, only shorter. We give a fixed-price quote within 3 to 5 working days of a free site assessment, never from a photo. Our hacking buying guide goes through planning the whole job.
Which walls can be hacked, and who decides?
A Professional Engineer should make that call, not the contractor. In a condo, structural slabs, beams, columns and walls can't be altered without an engineer's assessment, and the Commissioner of Building Control's approval is also required. In the Building and Construction Authority's (BCA) sample certificate, the engineer personally checks the approved structural plan and inspects the structural condition before certifying that no structural element will be altered. BCA has advised estates to keep a set of those plans for planning renovation work, so ask your management office whether it has them, and BCA sells copies of approved plans. Where a wall may be structural, we arrange the engineer. In a landed house, a structural change can count as additions and alterations (A&A) work.
Do I need approval or a permit before hacking?
No plan submission to the Building and Construction Authority (BCA) is needed for replacing floor and wall finishes, taking down a suspended false ceiling or demolishing a non-load bearing wall, the Building Control Regulations list shows, but structural works need an approved plan and a permit, and your estate or landlord may need to approve the work. Ask an engineer, not the contractor, whether a wall is non-load bearing. BCA says you still need any approvals other authorities require, and to consult a Qualified Person (a registered architect or Professional Engineer) when in doubt. In a condo, building works might require your management corporation's (MCST) approval, and yours may ask for an engineer's endorsement before demolition other than floor tiles, as BCA has advised estates. The Housing and Development Board (HDB) issues its own permits for HDB flats. Our article on approval to hack a wall covers each case.
Should I overlay my floor tiles or hack them out?
Overlay if the old floor is firm and the extra height works, because it skips the hacking and the debris. An overlay raises the floor everywhere it goes, so doors, thresholds and the first step have to work at the new level, and old tiles that have lifted or cracked may need to come up first. We check the old floor and those heights at the site assessment. Our flooring service lays the new floor either way, and our article on overlaying or hacking compares what each route adds to the bill.
What should a hacking quote include?
Everything that comes out, room by room, and to what depth, such as tiles only or tiles and the cement bed under them, so two quotes price the same job. Check it says how floors, lifts and corridors are protected, how the debris is cleared, what making good follows, such as patching wall edges or levelling the floor, and what happens if pipes, cables or anything unexpected turns up. In a condo, BCA's advisory to estates says that whenever the structure's reinforcement bars are exposed, the works shall be stopped and an engineer called in, and BCA notified. Construction and renovation debris counts as general waste, which no person or company shall collect or transport as a business without a General Waste Collector's Licence from the National Environment Agency (NEA).
When can hacking be done, and who sets the rules on noise, neighbours and debris?
In a condo or rented unit, your estate or landlord does, so get the renovation guidelines or building rules before booking. They can set the working hours, any separate hours for noisy work like hacking, how debris goes out and how the lift is protected. In a condo, neighbours affected by renovation noise may give feedback directly to the management corporation, the National Environment Agency (NEA) says. In a landed house, NEA regulates noise from A&A works, and the Urban Redevelopment Authority (URA) and BCA's guide for landed homes advises telling your neighbours your plans and how long the works will take. The same guide advises asking your builder or engineer to check for asbestos before renovation or demolition starts and, if it's found, having a competent contractor remove it and notify the Ministry of Manpower (MOM).
Do I have to hack everything out when my office or shop lease ends?
Only what your lease and your landlord say, so read the lease's reinstatement clause and your landlord's handover requirements, and ask in writing about anything unclear, such as whether floor tiles you laid can stay. If you lease from JTC, the government agency that leases industrial land and space, you're required to reinstate your premises before returning them on the lease expiry date, and JTC tells you the requirements after a joint site inspection, taking your lease's obligations into account. Send us the clause and your landlord's list, and we quote for taking out what has to go. If the handover needs more than hacking, our commercial renovation service quotes the whole reinstatement.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Hacking and Demolition project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All hacking and demolition guides and articles →Read the hacking and demolition buying guide →
Chat on WhatsApp