Living room with timber built-ins and seating beside wide garden doors.

Terrace, semi-D and bungalow interiors

Landed Interior Design

Interior design for a landed house, terrace to bungalow, covers several floors joined by a staircase, maybe a wet and dry kitchen, rooms under the roof or below ground, and walls an architect or engineer may need to check before anyone moves them. DirectHome takes the job on as principal contractor. Tell us which rooms you'd change, and why.

Why Choose Us

What You Get

Know which rooms belong on which floor

When the kitchen and laundry are downstairs and the bedrooms are up, every trip between them goes by the stairs. Where each room sits, such as a ground-floor bedroom with its own bathroom for someone who finds the stairs hard, shapes daily life more than the finishes inside it.

Know early which walls can move

Some walls carry only their own weight. Others hold up the floor above. That difference decides what a new layout costs and whether plans may have to go to BCA first, so it is worth knowing before the layout is drawn rather than after.

Know which repairs come before the carpentry

A damp patch low on a wall, a leak from an upstairs bathroom or a roof that lets heat into the attic stays a problem behind new cabinets and paint. Traced and fixed first, a leak won't force new built-ins to come out again later to reach it.

Know what the quote covers before you sign

The Competition and Consumer Commission's guide for renovation firms says quoted prices should be itemised, with mandatory charges stated at the start and changes made only with your express agreement. A quote set out that way shows whether the drawings, the building work, the carpentry and any architect or engineer fees are in the price.

Options

Materials & Systems

Cabinet boards under sinks and on outside walls

Water reaches cabinets first under a sink, beside a dishwasher and against an outside wall that takes the rain. Ask what board the carcass is made of and how its cut edges are sealed. A board sold as moisture-resistant is still no reason to fit it over a leak or damp patch that hasn't been traced and fixed.

Worktops beside the wok burner

Worktop makers give different heat advice. Caesarstone tells owners not to put hot pots straight from the stove onto its quartz and to use a trivet, while Cosentino says its Dekton surface resists high temperatures from hot objects. Check the care guide for the exact slab before deciding what goes next to the burner.

Floor tiles from the living room to the patio

A porcelain tile rated for outdoor use can run from the living room out to a covered patio, so the two read as one space. Where rain blows in at the patio door, choose a textured, slip-resistant finish for that strip rather than a polished one, and ask for the tile's slip rating.

A cooker hood for wok cooking

A ducted hood carries smoke and grease out through a duct to the outside. A recirculating hood filters the air and returns it to the kitchen. Decide which one you're getting before the cabinets are drawn, because a duct needs a route through a wall or ceiling to the outside.

How It Works

Our Process

01

Write down what each room has to do

This part is yours. Note who sleeps where, who needs a bathroom close by, which furniture stays and which rooms cause trouble today. That list is what the layout is drawn and checked against.

02

Find out what the house allows

Which walls carry load, where the pipes and drains run and what needs approval have to be known before the layout is fixed. Building owners can buy their approved plans from BCA, and BCA advises owners to engage a qualified person (a registered architect or professional engineer) to advise on clearances from BCA and other authorities such as URA.

03

Fix the layout, then price it

The designer settles where the kitchen, bathrooms, stairs and bedrooms go before finishes are chosen, because moving a sink or toilet after the cabinets are measured means remaking them. Only once the layout is fixed can a quote price the actual drawings and building work.

04

Build in the right order

Any plans that need approval go in through the qualified person before that part of the work starts. On site the main contractor runs the messy work first so it can't damage new finishes, starting with hacking and structural work, then pipes and wiring, then floors, built-ins and paint. CASE advises keeping the deposit low and paying in stages as each part is done.

05

Close the defects list, then pay in full

Walk every room at handover and photograph anything still outstanding. CASE advises paying the balance only once those defects are fixed, and the photos are your record if there is a dispute. Keep the final drawings and the care instructions for the materials.

From assessment to handover

Plan each stage around your home

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Landed Interior Design FAQ

How much does interior design cost for a landed house?
MoneySmart's April 2026 renovation cost guide says landed property renovations can easily exceed S$100,000. A February 2026 MoneySmart budget guide estimates about S$100,000 to S$300,000 for landed or private housing, and says the figure varies with the materials, what the home already has and the contractor or interior designer chosen. Neither figure is a quote for your house. What moves a job from one end to the other is how many floors you touch, whether the kitchen or bathrooms move (new drainage and waterproofing, and sometimes wiring), how many walls are hacked or built, how much built-in carpentry you want, whether the attic or basement is part of it, and whether a qualified person has to submit plans. New paint and carpentry on two floors is a very different job from gutting a three-storey semi-detached. Our landed interior design buying guide shows how to compare design fees and building costs separately. To price your own house, we start with a free site assessment, then a fixed-price quote within 3 to 5 working days, never from a photo.
What does a design fee pay for?
A design fee can cover the work done on paper before anything is built, such as working out the layout with you, detailed drawings for the built-ins and the electrical and lighting points, choosing materials and finishes, and checking on site that the work follows the drawings. A one-floor refresh needs far less of that than a whole-house replan. CCCS's renovation guide says quoted prices should be itemised, so ask for the design fee as its own line, saying which drawings and how many revisions it covers. Structural drawings and plans for BCA come from a qualified person, who must be a registered architect or professional engineer, so check whether that fee sits inside the design fee or is billed on its own.
Can I renovate a kitchen or bathroom on a fixed budget?
Yes, if the budget decides the scope. The biggest choice is whether the sink, toilet and shower stay where the pipes and drains already run. Moving them means new drainage, redoing the waterproofing and sometimes new wiring before any tile goes down, while keeping them lets the money go on surfaces, fittings and cabinets. Keeping appliances that still work also helps a fixed sum go further. Our landed kitchen renovation and landed bathroom renovation pages go through what drives each room's cost.
Do interior layout changes need approval?
Some do and some don't. BCA says owners may have to submit building or structural plans before renovating, but minor works listed as insignificant building works are exempt. The list in the Building Control Regulations includes replacing floor and wall finishes, changing windows and doors, all air-conditioning works, and taking down, restoring or putting back a non-load-bearing wall, or making an opening in one. A non-load-bearing wall is one that carries only its own weight. Work on a wall, beam or column that holds up the floor above isn't on that list, so it may need plans approved first, and that side of the job is additions and alterations work. BCA advises owners to engage a qualified person, a registered architect or professional engineer, to advise on the clearances needed, and work that is exempt from BCA can still need approval from other authorities such as URA.
Is an interior designer worth paying for?
It is worth paying for when the job moves things, such as opening up a kitchen, adding a bathroom upstairs, bringing a bedroom down to the ground floor or making an attic usable. Those changes have to be drawn and checked against the structure and the pipes before anyone builds, and a mistake found on paper is cheaper to fix than one found after hacking. If you're keeping the layout and renewing finishes and built-ins, you need much less design work. Either way, start by writing down how the household uses each room; our article on what to tell your interior designer before drawing begins shows what to include.
Do we have to move out, or can we renovate one floor at a time?
You can stay only if the household keeps a working bathroom, somewhere to prepare food, a bedroom and a safe way between them while the rest of the house is a site. Hacking brings heavy dust and noise. Wet works take a bathroom or kitchen out of use until the waterproofing and tiles are done. Rewiring and pipe work mean the power or water goes off in parts of the house while they are done. A whole-house job with all three running at once is hard to live through, so plan to move out for that. A single floor or a few rooms may be possible while you stay, as long as the rooms you keep don't share the pipes and wiring being changed. Our article on living at home during A&A works shows how to test a phasing plan.
How should I use terrace house design photos?
Use each photo to pin down one thing you want and the problem it solves, like daylight over a dining table or storage by the front door. Then ask whether it depends on something your house doesn't have, such as a wider plot, a taller ceiling or a different stair position. A photo is a starting point for the design, not proof the layout fits your house. Our guide to turning terrace house design photos into a workable plan takes this further, and if the photos you save are mostly about light, see ways to bring more light into a dark terrace house.
Can an attic or basement be included?
They can, but they need different thinking from the rest of the house. An attic sits right under the roof, so heat from the roof comes straight into it, and the roof and windows decide how hot it gets before any aircon is sized; see how to make a hot attic more comfortable. A basement sits against the ground, so any damp or water at its walls or floor has to be traced and fixed before finishes go on; see what basement waterproofing and drainage each do. Either room also needs a safe stair. If making the space usable means a new floor, a roof change or cutting into the structure, that is building work that may need plans from a qualified person, which our attic conversion and basement construction pages cover.
What changes the renovation schedule?
Three waits, in this order. Any plans that need approval from BCA or URA have to be approved before that part of the work starts. Made-to-measure items such as cabinets, worktops and doors can only be ordered once the layout and the appliance sizes are fixed, which is why it pays to choose kitchen appliances before the cabinets. Then repairs found once walls and floors are opened, such as a corroded pipe or a damp wall, have to be fixed before the finishes go over them. CCCS's renovation guide says the contract should carry an agreed schedule with start and completion dates and say how delays will be handled, so ask for that schedule once the scope and any approvals are settled.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Landed Interior Design project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work