Attic study with a clear central approach and low-eaves storage.

Turn the space under your roof into a real room

Attic & Loft Conversion

Roof space can become an attic room when four things work out. URA has to allow an attic within the height and setbacks set for your house, enough floor has to keep standing height once the ceiling and insulation go in, the stair needs somewhere to land below, and the room has to stay cool under the roof.

Why Choose Us

What You Get

Know how much of the floor you can stand on

The height under the ridge and the slope of the roof decide how much of the attic floor has standing room, and the new floor, ceiling lining and insulation each take some of that height. Ask for a side-view drawing with the finished ceiling on it and a line where an adult can stand upright. That line, not the floor outline, tells you whether a bed or desk fits.

Know what the stair takes from the floor below

A stair to the attic needs an opening in the ceiling below and floor space where it lands, so it comes out of a bedroom, a corridor or a landing underneath. Before its position is fixed, check which doors it blocks, which room gets smaller and how you'd carry a mattress up. The new room has to be worth the space the stair takes.

Know how hot the room will get

A room right under the roof soaks up heat from it through a sunny afternoon, and roof glass lets the sun straight in. Before you agree the design, ask how the spot where the bed or desk goes will be kept comfortable at that time of day, and whether that relies on insulation, shading, aircon or all three.

Know what URA allows on your house

URA sets an envelope for every landed house, an outline made from the storey limit and the setbacks from its boundaries, and an attic has to fit inside it. The storey limit is two or three storeys, or the storey height shown for your estate in the Master Plan, whichever is lower. Ask your Qualified Person to check your house against it before the attic is designed in detail.

Options

Materials & Systems

Mineral wool insulation

Rock wool or glass wool laid into the roof build-up slows the heat coming through the roof, and it takes the edge off rain noise on a metal roof. It needs to stay dry, so it goes in with the roof's waterproofing and moisture control rather than as a later add-on.

Roof windows and shading

A fixed skylight brings in daylight but no air. An opening roof window lets hot air out at the top of the room but has to be shut before rain. Shading outside the glass stops the sun's heat before it gets in, while a blind inside cuts glare but leaves the heat in the room.

Stair to the attic

A straight flight needs the longest opening in the ceiling below. A stair that turns at a landing, or a spiral, fits a shorter opening but makes it harder to carry furniture up. We recommend a railing around the stair opening at attic level so nobody steps back into it.

Dormer or skylight

A dormer is a framed box built out from the roof slope. It gives standing height and an upright window, but because it changes the shape of the roof, it has to be part of the URA and BCA submissions and waterproofed where it meets the roof slope. A skylight adds light without adding height, and lets direct sun into the room.

How It Works

Our Process

01

Find the approved plans and say what the room is for

The owner gathers the house's approved plans. If you don't have them, you can buy copies from BCA through its Plan Purchase Application Form. Add photos taken from inside the house, never from the roof, and say what the room is for and when it will be used, such as a bedroom at night or a study in the afternoon.

02

Appoint a Qualified Person

The owner engages a Qualified Person, a registered architect or professional engineer with a valid practising certificate, to advise on the approvals the work needs from BCA and other authorities such as URA. Checking the existing structure can mean opening up part of a ceiling or the roof to see what's there, and that's a job for the contractor, not the homeowner.

03

Get the plans approved before building

Where the design meets URA's lodgment criteria, a registered architect or engineer lodges it with URA, and lodged works that meet the criteria don't need a separate planning permission application. Only a Qualified Person who is a professional engineer in the civil or structural discipline can apply to BCA for structural plan approval, and the application includes URA's planning permission or lodgement receipt. Building work waits for both.

04

Get the permit, then build

Once the structural plans are approved, a permit is needed before structural work starts. It's applied for jointly by the Qualified Person, the builder who will carry out the works and the developer, which the Building Control Act defines as the person the work is carried out for. If something found on site needs a key structural part redesigned, BCA approves the change before it's built. New water and waste pipes for a bathroom are work for a PUB Licensed Plumber.

05

Check the roof joints before they're covered

Each new skylight, dormer or new-to-old roof joint should have its flashing and waterproofing checked and photographed before the ceiling closes over it. Agree in writing who does that check and who answers for a leak at those joints later. Keep the approved plans, final drawings and photos with the house documents for the next time the house is altered.

From assessment to handover

Plan each stage around your home

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Attic & Loft Conversion FAQ

Can I build an attic or attic loft in my house?
URA may allow an attic as incidental space inside your house's permitted two-storey or three-storey envelope, the outline of height and setbacks the house has to stay within. Its handbooks for terrace, semi-detached and bungalow houses say so in the same words, and the word "may" means each design is checked, not that every roof qualifies. On an existing terrace, semi-detached or detached house, adding an attic counts as A&A under URA's guideline only if it increases the gross floor area by less than 50%, and a new roof, even a higher one, mustn't add a storey. Otherwise URA treats the job as reconstruction, not A&A works. A roof terrace on an attic roof has to sit at least 3 m below the top of the envelope. Your Qualified Person checks the design against these rules. That's a registered architect or professional engineer with a valid practising certificate, whom you engage to advise on the approvals needed from BCA and URA.
Does an attic conversion need approval?
Yes, unless your Qualified Person confirms the work is one of BCA's insignificant building works. BCA needs approved structural plans and a permit before building works start for everything except the insignificant works listed in its regulations. For URA, a design that meets its lodgment criteria for A&A to a landed house, including the limit on how much floor area the attic adds, can be lodged instead of going through a planning permission application, but lodgment isn't open to houses in conservation areas, Good Class Bungalow Areas or special control areas. Outside those criteria, ask your Qualified Person which URA application applies. An attic built without the approvals it needed is unauthorised building work, which is an offence under the Building Control Act.
Can the attic be a bedroom, and how much headroom does it need?
BCA's headroom rule depends on the attic's size. In a house built for the owner's own use, the requirement that every room has adequate headroom and height for its use doesn't apply to an attic of 10 square metres or less, and BCA's Approved Document sets just those two conditions. A bigger attic has to meet the requirement, and the Approved Document treats it as met with a ceiling height of at least 2.4 m and headroom of at least 2.0 m. Ask your Qualified Person how that's measured under your sloping roof. Either way, the low space near the eaves suits built-in storage better than a bed, as long as the cupboards don't block a service hatch or a window, and a dormer can give standing height where URA and BCA approve it. For fresh air, BCA doesn't require natural ventilation in a landed house built for the owner's use, so an attic bedroom can rely on mechanical ventilation or aircon with mechanical ventilation instead. Using the attic as a bedroom, study or storage covers what each use needs.
Do I need a proper staircase, or will a loft ladder do?
For a room you'll use every day, we recommend a fixed stair with a handrail. That's our advice rather than a BCA requirement, because BCA's staircase requirements for handrails, landings and width, tread and riser don't apply to landed houses built for the owner's use. Your Qualified Person still checks the stair against the rules that do apply, such as its structural design. A folding loft ladder takes less space but suits occasional trips to storage, not carrying a laundry basket down at night. Our staircase renovation page covers stair types and handrails.
Will adding insulation make the room cool enough?
Not on its own. Insulation slows heat coming through the roof, but it does nothing about sun shining through roof glass and it doesn't cool the air. So the room also needs shading on any skylight and its own cooling, which means planning where the aircon's pipes run and where its outdoor unit goes. Making a hot attic more comfortable goes through the roof, glass and cooling choices together.
How much does an attic conversion cost in Singapore?
We can't point you to a current independent price for attic conversions in Singapore, so here's what sets the price, from the smallest job up. Lining and insulating roof space that already has a floor and standing height is the smaller job. A new floor and a new opening for the stair add structural work, plus changes to the room below where the stair lands. A dormer or a raised roof adds roof and waterproofing work and makes the URA and BCA submissions bigger. A bathroom adds water and waste pipes up to roof level, and aircon adds its own pipes and power. The Qualified Person's fees and the submissions are separate lines on top. Two attics the same size can end up at very different prices for these reasons, so ask for each of these steps to be priced as its own line. The attic conversion buying guide shows how to compare complete quotes.
Will cutting into the roof cause leaks?
Opening up the roof is a contractor's job at height, so from inside the house you only look and note. Every new skylight, dormer or vent makes new joints in the roof, and joints are where rain finds its way in if they aren't detailed properly. Each one needs flashing, the shaped strip that sheds rain over the joint, plus waterproofing, and both should be checked and photographed before the ceiling closes over them, because a leak found later means opening up the finished room. Ask who checks them and who answers for a leak at those joints afterwards. Roof waterproofing covers the rest of the roof.
Can I put a bathroom in the attic?
It's possible, but water has to get up there and waste has to get down. Supply pipes have to reach roof level, and waste pipes need a fall to the existing drain pipes, which can mean raising the bathroom floor. That floor then needs waterproofing over the rooms below. PUB requires a Licensed Plumber for regulated water and sanitary plumbing work, leaving handymen only simple jobs such as replacing a tap or fitting a basin. If the water has to be pumped or stored in a tank to reach the attic, PUB requires a Professional Engineer to design and supervise that system, and for building works the owner engages a Qualified Person to prepare and submit the sanitary plans. How bathroom waterproofing prevents leaks after renovation explains the checks before tiling.
How long does an attic conversion take, and can we stay at home?
The time goes on stages, so ask for a date against each one rather than a single finish date. The Qualified Person's design comes first, then the URA and BCA submissions and their replies. BCA's own targets for processing a complete structural plan application are 20 working days for a submission through CORENET X, which BCA says new projects must use from 1 October 2026, or 7 working days through CORENET 2 (10 days for a first submission with an accredited checker's certification), then 7 working days for the permit, and possibly longer where more evaluation is needed. Your Qualified Person knows which system the job goes through. Windows and skylights have to be ordered, and roof work waits for dry weather, as whether roof waterproofing can be done in the rain explains. Staying inside the existing roof shape means fewer of these stages than adding a dormer or rebuilding the roof. While the roof is open and the stair opening is cut, the rooms right under the attic and the room where the stair lands get dust, noise and a risk of rain, so agree in writing which rooms are out of use for which stage and how they're covered. Living at home during A&A works helps you decide whether to stay.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Attic & Loft Conversion project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All attic & loft conversion guides and articles →Read the attic & loft conversion buying guide →