Landed kitchen with cooking, washing and preparation areas around a clear passage.

A kitchen planned around how you cook

Kitchen Renovation

A kitchen renovation contractor does more than fit cabinets. If the sink, hob and hood stay where the pipes, gas and duct already run, the work centres on the cabinets, worktop and appliances. Move them, or add a wet kitchen for wok frying, and each one needs new pipes, power, gas or ducting, which is what adds cost and time.

Why Choose Us

What You Get

Know if your layout works before it's built

Trace an ordinary meal on the plan, from the fridge to the sink, the hob and the table. If wet ingredients or a hot wok have to cross the dining area, the sink or hob is in the wrong place, however neat the drawing looks. Check too that the dishwasher and the drawers beside it can open while someone walks past.

Know where the frying smoke goes before the cabinets close in

A ducted hood pipes the cooking air out of the house, while a recirculating hood filters it and sends it back into the kitchen. A duct has to run above or through the wall cabinets, or through the ceiling, to its way out, so the hood type, where the duct leaves the house and how you'll reach the filters need settling before the wall cabinets are drawn.

Know which appliance models the cabinets are built around

An oven, hob or dishwasher comes with its own cut-out size, ventilation gap and socket or gas point, and these can change from one model to the next. Picking the exact models before the cabinet drawings are made lets the openings fit what you bought. A late swap can mean a recut cabinet or a moved socket.

Know what the quote covers besides the cabinets

A price per foot run covers the cabinets. The rest of a kitchen renovation is taking out the old kitchen, any new pipes, wiring, gas pipe and hood duct, the worktop with its sink and hob holes, fitting the appliances, and making good the walls and floor. With each of these listed, two quotes can be compared on the same work.

Options

Materials & Systems

Plywood carcass

The board we recommend for cabinets around the sink, dishwasher and hob, where steam and the odd leak reach them. Ask for sealed edges and a removable panel under the sink so the pipes can be reached.

MDF or particleboard carcass

Better kept to the dry side, away from the sink and steam, because water getting in at an unsealed edge or seam can make the board swell.

Aluminium or stainless steel carcass

Metal doesn't soak up water, so a slow leak under the sink can't swell it. It won't keep water off the wall or floor behind, so the pipes still need a panel you can remove.

Quartz, sintered stone or granite worktop

Each is cut to fit the cabinets, with holes for the sink and hob. Heat and sealing rules differ from one product to the next, so the care sheet for the exact slab matters more than the category, especially beside a wok burner.

How It Works

Our Process

01

Show how you cook and what isn't working

Start with photos of the kitchen, what's awkward now, which appliances you're keeping and how often you wok-fry. Point out any leak marks or swollen cabinet boards, because the cause of a leak should be found before new cabinets cover it.

02

Find out where the pipes, gas and duct can go

Before the layout is fixed, check where the water supply, waste pipe, gas pipe, power points and hood duct run now, and where a moved sink, hob or hood would need them. New water pipes are Licensed Plumber work under PUB's rules, new wiring should be done or supervised by a Licensed Electrical Worker, and gas work goes to a Licensed Gas Service Worker. If a wall is cut or the kitchen is extended, a Qualified Person advises on the approvals needed.

03

Pick the exact appliances, cabinets and worktop

Choose the hob, oven, hood, dishwasher and sink by model before the cabinets are drawn, since their cut-outs, ventilation gaps and connection points set the cabinet sizes. Agree in writing who approves a change, and how its cost is worked out, before anything is ordered.

04

Measure again before anything is made

Once the new pipes, sockets and gas point are in place, take the final measurements and send the cabinet drawings for making. Ask the worktop fabricator whether the stone will be measured from the drawings or from the fitted base cabinets, since the sink and hob holes are cut to suit.

05

See every appliance working before handover

At handover, the installers show the hob, oven, hood and dishwasher running, where each one is switched off or isolated, and how to reach the pipes under the sink. Check that doors and drawers open past each other as drawn, and keep the manuals, care sheets and final drawings.

From assessment to handover

Plan each stage around your home

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Kitchen Renovation FAQ

How much does a landed kitchen renovation cost in Singapore?
Keeping the sink, hob and hood where the pipes, gas and duct already run keeps the work to new cabinets, the worktop and appliances. Moving them is what adds cost, because each moved fitting brings its own work, such as a water supply and a waste pipe for a sink, a gas pipe or a power supply that can carry an induction hob for a hob, and a new duct out of the house for a ducted hood. Each of those means opening walls or floor and making them good again. A separate wet kitchen adds a set of these for every sink, hob or appliance you duplicate, which is why it costs more than its extra cabinets. A price per foot run covers the cabinets alone, and our look at per-foot wardrobe quotes shows what that kind of carpentry price can leave out.
Can a carpenter make and fit my kitchen?
A carpenter, or a kitchen cabinet contractor, can make and fit the cabinets, which is the part of the job that carpentry and built-ins covers. The pipes, wiring and gas behind the cabinets are different work. PUB requires a Licensed Plumber for regulated plumbing, such as laying or altering water pipes and relocating sanitary piping, though its list of simple works a handyman may do includes installing or replacing a sink with its trap. EMA says electrical work at home should be carried out or supervised by a Licensed Electrical Worker, which covers new sockets for an oven, dishwasher or island. For a gas hob, EMA's advice is to engage a Licensed Gas Service Worker for any gas service work. So if you hire a kitchen carpenter, ask who is doing the plumbing, wiring and gas, and who is responsible for each.
How long does a landed kitchen renovation take?
We can't give you a number of weeks until the scope is set. These are the things that decide how long you're without a kitchen. The cabinets and worktop can't be made until the appliance models and final measurements are fixed, so a late change of oven or hob holds them up; an appliance schedule settles the models early. Moving the sink or hob means new pipes, wiring or gas before the cabinets go in, and new floor tiles or waterproofing in a wet kitchen can need drying time. EMA's advice is to have City Energy cut off the piped gas before renovation work starts, so a gas hob is out of use from the first day. If a wall comes out or the kitchen is extended, any approval it needs comes first. Ask for the days without water, a sink and cooking to be marked on the programme, not only the finish date.
Do I need approval to renovate or extend my landed kitchen?
Cutting into a wall or beam, or enclosing part of the yard or porch to make the kitchen bigger, is building work that can need plans approved. BCA says private owners may be required to submit building or structural plans for approval, though some minor building works are exempt. Its advice is to engage a Qualified Person, a registered architect or professional engineer, to advise on the clearances needed from BCA and other authorities such as URA, and to consult the QP when in doubt. Approval is separate from who may do the work. New water pipes are Licensed Plumber work under PUB's rules, and new wiring should be done or supervised by a Licensed Electrical Worker under EMA's guidance. For a kitchen extension, read what A&A works mean for a landed house.
What is the difference between a dry kitchen and a wet kitchen?
A wet kitchen is the closed one, behind a door or glass screen, for frying, wok cooking and washing up; a dry kitchen is the open one near the dining area for preparing food and drinks and serving. A separate wet kitchen is worth it if you fry or wok-cook often enough to want the smoke and grease shut away, and every sink, hob or appliance you put in both needs its own pipes, power, gas or duct. The kitchen guide goes through whether a separate wet kitchen is worth it for your cooking.
What hood and ducting do I need for wok cooking?
For a gas hob and regular wok frying, choose a hood that ducts the air outside. Miele's hood guide says an extraction hood should be installed where possible above gas cooktops, lists frequent wok, grill or deep-fat frying among the cooking it suits, and notes that with a recirculating hood the moisture generally stays in the room. It also says extraction needs a supply of fresh air, such as an open window, and that air throughput depends on the type and diameter of the ducting. Bosch's installation advice likewise is to keep a window open near the hob in extractor mode, and to keep the space between the hood and the wall sleeve, where the duct passes through the outside wall, as small as possible to prevent performance losses; if that distance is too far, it recommends a recirculating hood instead. So a hob near an outside wall is worth planning for, and the duct's way out needs agreeing before the wall cabinets are drawn. The ducted and recirculating hood comparison goes through the choice for a landed kitchen.
Which cabinet materials last in Singapore humidity?
Around the sink, dishwasher and hob, we recommend plywood or an aluminium or stainless steel carcass. Formica's guide to the boards under its laminates says MDF and particleboard perform reliably in dry, controlled conditions and that plywood can offer more strength, screw-holding and resistance to humidity, though it rates plywood only marginal as a base for bonding its own laminates. A metal carcass doesn't soak up water, so a slow leak under the sink can't swell it the way it can swell a board, but it won't keep water off the wall or floor behind. Whatever the board, ask for sealed edges and a removable panel to reach the pipes under the sink, because the same maker's care advice warns that water flooding laminate near seams can make the board underneath swell. The kitchen guide explains how to choose cabinets for the wet side.
Sintered stone, quartz or granite for the worktop?
Choose by how you cook, because each maker sets its own heat rules. Caesarstone asks owners to always put hot items on a trivet or heat pad on its quartz. Cosentino says its Dekton sintered stone is designed to withstand hot saucepans and frying pans, but still recommends mats for longer periods, especially on its 4 and 8 mm slabs. For granite and other natural stone, the Natural Stone Institute says many stones can withstand heat but recommends trivets or mats, and that sealing makes stone more stain resistant rather than stain proof, while many stones may not need sealing at all. So in a wet kitchen, decide where a hot wok lands before choosing the slab, and ask the supplier for the exact product's care sheet. The worktop care article compares the routines before you choose.
Can I move the sink or hob, or add an island?
You can, but each move adds work behind the cabinets. A moved sink needs a new water supply and a waste pipe that falls all the way to a drain, which can mean opening the floor or building a low platform for the pipe to run under. New water pipes are Licensed Plumber work under PUB's rules, unlike swapping a sink in the same place. A hob on an island needs gas or power brought out to the middle of the room and somewhere for the cooking air to go; for that, Bosch lists island chimney hoods that hang from the ceiling and venting hobs with the fan built into the hob. New wiring for an induction hob or oven should be carried out or supervised by a Licensed Electrical Worker, and a gas pipe to a moved hob goes to a Licensed Gas Service Worker under EMA's advice. Settle all of this before the cabinets are made.
Can we stay in the house during the renovation?
Other rooms can stay in use while the kitchen is done, but the kitchen itself won't be. EMA's advice is to have City Energy cut off the piped gas before renovation work starts, and the water may be shut off for a time while new pipes are connected. Before work starts, decide where the fridge, a kettle and microwave, and the washing up will go, away from the dust. With a wet and a dry kitchen, ask whether the two can be rebuilt one after the other, so one keeps a counter, the fridge and a working socket.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Kitchen Renovation project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All kitchen renovation guides and articles →Read the kitchen renovation buying guide →
Chat on WhatsApp