Basement with a high lightwell, floor access cover and darkening along the wall-floor junction.

For a basement that leaks or one still to be dug

Basement Construction

Water through a wall joint after rain, water running in at the entrance and damp from condensation on cold walls can all look like a leaking basement, but each one is fixed differently. If your basement isn't dug yet, the engineer's design has to be approved and the houses next door surveyed before digging starts.

Why Choose Us

What You Get

Know where the water gets in before you pay for a fix

The three water paths above are different problems, and a plumbing leak can look like any of them. A concrete basement has seams at the joints between concrete pours and where pipes pass through the wall. They're the first places to look, and they're why Sika's watertight concrete system pairs the concrete with joint sealing. A repair should name the water path it treats.

Know what the dig means for the houses next door

Between terrace or semi-detached houses, URA and BCA's Be Good Neighbours guide notes there's usually little setback between a new basement and the neighbours, and that ground movement from the dig may affect their remaining party wall. Surveys and monitoring manage that risk; they don't promise no damage.

Know which rooms your basement can hold

What the room is for decides how deep, how high and how well ventilated it has to be. On sites in low-lying landed housing areas, URA's and PUB's rules can rule out openings and bedrooms below PUB's Minimum Platform Level.

Know who keeps the pumps and drains working

Where rainwater can't be kept out of a basement completely, PUB's drainage code requires a pumped drainage system with at least one standby pump and a generator for power cuts, and makes the owner responsible for maintaining, operating and monitoring it. Ask where the sump, pumps and inspection points will sit, and keep them reachable once the flooring and joinery go in.

Options

Materials & Systems

Earth retaining structure

A wall of piles or sheets that holds the ground back while the basement is dug and built. The engineer picks the system from the depth, the soil and water, and how close the houses next door are, and URA and BCA's Be Good Neighbours guide says one should be used for a dig deeper than 1.5 m, designed by a Professional Engineer and submitted to BCA for plan approval.

External waterproofing

A membrane or coating on the outside of the walls and under the floor slab, the side the groundwater pushes against. Sika notes that some coatings applied after the concrete is poured need access to the outside surfaces, so this is planned while the hole is open.

Watertight concrete and joint sealing

Concrete made to resist water still has joints between pours and holes where pipes pass through. Sika's system pairs its watertight concrete with joint sealing for construction and movement joints, and an admixture in the mix isn't a promise that every crack will seal itself.

Internal lining or drainage system

An inside lining holds water back at the room face; a drained system collects water that gets through and sends it to a sump and pump. Neither stops water reaching the concrete, and a drained system needs power, servicing and access.

How It Works

Our Process

01

Decide what the basement is for, or record the leak

A car park, a home theatre and a guest room need different depths, headroom and services, so the use is settled before anything is designed. For a basement that already leaks, note when water appears (after rain, at the entrance or on cold walls) and photograph the patch, the wall-to-floor joint and any entry point from a dry spot. Keep away from standing water near anything electrical, and leave opening up finishes to the contractor.

02

Investigate the ground and the existing house

A soil investigation shows what ground and water the dig will meet, and where a site investigation report goes to BCA it must be endorsed by a Professional Engineer. The existing house is surveyed and its foundations checked. For a leak, the water path is traced and told apart from a plumbing leak or condensation before a repair is chosen.

03

Get the plans approved and the permit issued

The QP, a civil or structural Professional Engineer, applies to BCA for structural plan approval. The developer, the QP and the builder then apply jointly for the permit, and structural work can't start without it.

04

Survey the neighbouring houses before digging

Before any digging, the builder surveys the nearby houses with the QP, and each nearby owner gets a copy of the report on their own house before construction starts.

05

Dig, build and hand over

The excavation follows the engineer's retaining system and digging sequence, and a material change to the approved structural plans needs BCA's approval before it's built. At handover the owner should get the drawings, the inspection records, how the pumps and alarms work and who to contact when one fails.

From assessment to handover

Plan each stage around your home

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Basement Construction FAQ

How much does a basement cost in Singapore?
We can't point you to a current independent price for building a basement or repairing a leaking one, so here's what makes one job bigger than another. A deeper dig needs a taller retaining wall and, below the water table, puts more water pressure on the floor and walls. Digging under a house you're keeping means holding up its foundations while the ground beneath is removed, which a rebuild avoids. A neighbour close to the boundary means a stiffer retaining wall and closer monitoring, and BCA and URA's Be Good Neighbours guide tells owners planning a basement to factor in the cost of the retaining system, its design submission to BCA and repairing any damage the dig causes. High groundwater means pumping during the dig, and a basement that needs a pumped drainage system afterwards goes on costing power and servicing for it. For a leak, sealing one joint or crack is a smaller job than lining whole walls or adding a drainage system, and reaching the outside face means digging. Our basement construction cost article explains what has to be investigated before a price can be relied on.
Can I build a basement under my house?
URA allows basements under landed houses within set limits, so in principle yes, but adding one under a house you're keeping is a harder job than building one into a rebuild. The house's foundations have to be held up while the ground beneath is dug out, in a tight space and a set order; a rebuild or major extension opens other options. Under URA's envelope control guidelines, a basement that sticks out above ground can't come closer to the road than URA's road buffer, or closer to your other boundaries than the building setback. A fully underground one can come closer. The road reserve is land to be handed to the State for the road, and the road reserve line on the Road Line Plan is where that land meets your plot; a fully underground basement can go right up to that line if the part under the green buffer is at least 2 m down, and up to your site boundary if there are no technical requirements such as sewerage or drainage, no adverse impact on the adjoining property and no openings into the next site. Terrace and semi-detached houses also need the part under the 2 m planting verge at least 2 m down, and in a Good Class Bungalow Area it's set back 2 m from the boundary. On sloping ground, URA may consider an exposed protrusion that stays within the envelope height. Between terrace or semi-detached neighbours, URA and BCA's Be Good Neighbours guide says a basement can be allowed, but the owner should weigh the risk to the party walls and take measures against damage.
Do I need approval to build a basement?
Yes. Only a Qualified Person who is a registered Professional Engineer in the civil or structural discipline can apply for BCA's structural plan approval, and once the plans are approved, structural work can't start until a permit is issued. The permit is applied for jointly by the developer (under the Building Control Act, the person the building works are carried out for), the QP and the builder who will do the work. Plans can be approved in phases, and BCA's own example includes a basement stage; a material change to the approved plans needs approval before it's built. The structural plan application includes URA's planning permission or lodgement receipt, so the design also has to sit within URA's basement limits. PUB's drainage code says a new house or a rebuild has to meet its Minimum Platform Level, while A&A works to an existing building with no link to underground special facilities such as rapid transit systems need not, though PUB says the QP should still recommend that level to reduce flood risk; the QP confirms which applies.
Will digging a basement damage my neighbour's house?
It can, which is why a survey before the dig is a legal requirement and monitoring during it is part of URA and BCA's guidance, though none of this guarantees no damage. BCA's guide to pre-construction surveys says Regulation 32 of the Building Control Regulations requires a survey recording the condition of buildings close to the site before any excavation, piling, foundation or demolition work starts, and failing to carry it out is an offence. The builder should carry it out in consultation with the QP, who decides how far it needs to go; as a guide, BCA's minimum zone for excavation is 15 m from the site boundary. Each nearby owner must get a copy of the report on their house before construction starts, which helps show later whether a crack was already there. URA and BCA's Be Good Neighbours guide says the engineer should also assess the dig's impact, and where neighbours could be affected, the owner must make sure the builder monitors those houses closely so work can be halted if damage starts to show.
How long does basement construction take?
We can't give you a number of weeks until the ground is investigated and the design is drawn, because the dig, the structure and the waterproofing depend on what the investigation finds. The time figures we can point to are BCA's processing targets. Under CORENET X, which BCA says is mandatory for all new projects by 1 October 2026, structural plans go in as part of a joint cross-agency submission that BCA aims to process within 20 working days, and the structural works permit within 7 working days of complete documents. Those targets apply to complete applications that meet the requirements first time.
Can a leaking basement be waterproofed from inside?
Yes, but an inside lining keeps water out of the room, not out of the wall. Sika says internal systems, applied to the inside face, do not prevent damage to the structure from water ingress and are only recommended for refurbishment where the outside surfaces can't be reached. On an existing basement the outside face can only be reached by digging down beside it, so an inside repair ranges from sealing one leaking joint or crack, to lining whole walls, to a system that collects the water and pumps it away, which needs power, servicing and a plan for blocked drains and pump failures. Waterproof paint over a damp patch doesn't tell you which of these the leak needs. Sort out the water before choosing a floor; the basement buying guide explains choosing flooring for a dry, assessed floor.
Can a basement have a bedroom or a light well?
Not on every site. On sites in low-lying landed housing areas, URA's envelope control guidelines for terrace, semi-detached and detached houses require any building structures or living areas below the Minimum Platform Level, which PUB sets, to be fully sealed with no external openings. If external openings are proposed, PUB's additional requirements apply: the internal finished floor at least 300 mm above the adjacent road, only driveways, bin centres, turfed compound areas, car porches or other areas PUB approves below that level, and bedrooms and M&E installations above it. PUB's drainage code also requires a crest level, a minimum height for the bottom of every entrance, exit and opening into a basement, ventilation openings included. An open light well lets rain straight in, and that water has to be drained or pumped away. A room people use also needs fresh air and equipment that can be serviced, which our article on basement ventilation and plant access covers.
Can a home lift go down to the basement?
It may be possible, provided the lift is chosen before the basement design is fixed. Pit, shaft and headroom needs depend on the lift system, and any pit sits below the basement floor, so it becomes part of the structure and the waterproofing. Our guide to home lift shaft dimensions explains what a shaft needs, and the home lift service page covers the lift itself.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Basement Construction project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All basement construction guides and articles →Read the basement construction buying guide →