Empty condo living room before renovation, with a pale marble look floor, full height windows and a sliding door to a small balcony, and a rolled floor plan, a tape measure and three material samples laid out on the floor.

Floors, walls, wiring, windows and toilets in your condo unit

Condo Renovation

Get flooring, painting, wiring, aircon, windows, hacking and a toilet upgrade done in your condo unit by our specialists, with one contractor arranging and supervising every trade. We plan the job around your estate's approvals. Changing windows or outside walls needs your management corporation's (MCST) approval, and a structural wall needs a Professional Engineer and the Commissioner of Building Control.

Why Choose Us

What You Get

One contractor for every trade in your unit

Your flooring, painting, wiring, aircon, windows, hacking and toilet are each done by our specialist for that trade, and we arrange and supervise them all. You deal with one contractor instead of lining up several firms around the hours your estate allows.

A fixed price after a free site assessment

We visit, measure and go through what you want changed, then send a fixed-price quote within 3 to 5 working days, never from a photo. Have your estate's renovation guidelines ready, so the quote allows for anything they ask for, such as how the lift and corridors are protected.

Engineer arranged where needed

A structural slab, beam, column or wall can't be altered without a Professional Engineer's assessment and the Commissioner of Building Control's approval, and your estate may ask for an engineer's endorsement even for a wall that isn't structural. Where the work or your estate needs one, we arrange the engineer.

What BCA requires for new windows

Windows are fixed on the outside of the building, so changing them needs your estate's approval, and it can set a design so every unit matches. BCA says replacement windows need an approved window contractor, or a builder, with a trained window installer.

One contractor for the whole job

The trades we handle

Flooring

New flooring over firm old tiles skips the hacking but raises the floor at every door. Hacking the tiles out is noisy work, kept to the hours your estate allows.

Painting Services

Painting inside your unit is the simplest job here. Outside walls are common property, so they aren't yours to repaint, and changing anything on the outside needs the estate's approval.

Electrical Works

The Electricity Act 2001 makes it an offence to do electrical work, which includes adding or replacing any part of an installation, unless you're a Licensed Electrical Worker or supervised by one. Its exceptions, subject to any other written law, include replacing a lamp connected in your own installation, or a fuse in your own installation similar to that of a household.

Air-Conditioning

Only a BCA trained aircon installer may fit a unit outside or projecting from the building. BCA doesn't say where outdoor units go, so check your estate's guidelines.

Windows

Changing windows needs your estate's approval, and it may set a design so units match. BCA requires an approved window contractor, or a builder, with a trained window installer.

A&A Works

Moving a partition can be exempt from URA planning permission if the unit stays one home. Structural walls need an engineer and BCA, and adding floor area a 90% resolution.

Hacking and Demolition

Your estate may ask for a Professional Engineer's endorsement that a wall isn't structural before it comes down, as BCA has advised estates to. Hacking is kept to the noisy-work hours your estate sets.

Bathroom Renovation

Hacking up a condo toilet floor means new waterproofing, tested before retiling, since a leak can reach the unit below. Tiling over the old floor leaves the old waterproofing in place.

How It Works

Our Process

01

Free site assessment

We visit, measure each room and go through what you want changed. We check it against your estate's renovation guidelines and look for anything that needs a Professional Engineer, such as a wall you want taken down. Have the estate's guidelines and your unit's floor plan ready if you can.

02

Get a fixed-price quote

We send a fixed-price quote within 3 to 5 working days of the site assessment, never from a photo. Check that it covers each trade, debris removal, the lift and corridor protection your estate asks for, and any engineer's endorsement, so none of them turns up later as an extra.

03

Approvals before work starts

Your estate's approval is yours to apply for as the owner, and we give you the scope and the details of the work its form asks about. Where the work needs them, we arrange the Professional Engineer or Qualified Person. Work starts once any approval your estate needs is in.

04

Our specialists do the work, and we supervise

Each trade is done by our specialist for it. By law, electrical work must be done by a Licensed Electrical Worker or under one's supervision, and BCA requires an approved window contractor, or a builder, with a trained window installer to replace windows. We supervise throughout, inside the working hours your estate sets, with the protection its guidelines ask for in the lift and corridors.

05

Hand over and keep the records

We walk the unit with you, try every switch, tap, window and door, and check the corridor outside your unit is left clean and undamaged. The work comes with our warranty and after-care. Keep any engineer's endorsement with your unit's papers.

From assessment to handover

Plan each stage around your home

Start with the existing conditions, measurements and access the work will need.

Agree which surfaces and belongings need protection before work begins.

Use the handover to record outstanding items and collect the care and service information.

Common Questions

Condo Renovation FAQ

Do I need MCST approval to renovate my condo?
Ask your management office first, because the answer is in your estate's by-laws. A management corporation can make by-laws requiring its approval before work in your unit, with conditions such as a Professional Engineer's endorsement for structural work. By-laws are passed at general meetings, and you're bound by them even if you didn't vote. Some work needs the estate's approval in any case, such as changing windows or outside walls. The approval is yours to apply for as the owner, and we give you the scope and the details of the work your estate's form asks about. Our article on getting MCST approval for a condo renovation goes through the application.
Can I hack walls in my condo?
Only once you know which kind of wall it is. Structural slabs, beams, columns and walls can't be altered without a Professional Engineer's assessment and the Commissioner of Building Control's approval. For hacking anything other than floor tiles, BCA has advised management corporations to ask for plans endorsed by a Professional Engineer certifying that no structural work is involved, so your estate may ask for one. The same advisory asks management corporations to keep a full set of the approved structural plans for planning renovation work, so ask your management office for them. Where your estate asks for an engineer's endorsement, or a wall may be structural, we arrange the engineer before any hacking. For walls that aren't structural, see our hacking service.
What are the renovation hours in a condo?
Your estate sets them, so get its renovation guidelines before booking any work. NEA regulates noise from renovation work in landed homes, while condo units are managed by their MCST, which is who neighbours go to about renovation noise. The guidelines are where you'll find the working days and hours, any shorter hours for noisy work such as hacking, and how the lift and corridors must be protected. We plan the order of work around them, so the noisy jobs fall in the hours your estate allows.
Can I change my condo's windows or add grilles?
Windows only with your estate's approval, because they're fixed on the outside of the building and alterations to them aren't allowed without approval from the MCST and any relevant government agency. BCA's window safety rules say replacement windows need an approved window contractor, or a builder, with a trained window installer, and the approved window contractor must give you a signed report when the work is done. Safety grilles are different. The management corporation can't stop you installing them, but you must follow any design guidelines it has for them. Our window service explains how a replacement runs.
Can I put up an awning or close in my balcony?
An open-sided cover over a balcony, roof terrace or private enclosed space doesn't need URA's planning permission, but you need your MCST's consent and must meet other agencies' rules, such as BCA's and SCDF's, where they apply. A balcony can't be closed in, because URA says balconies shall not be enclosed with walls or glass panels. Anything that adds floor area, such as roofing in a private enclosed space, needs a 90% resolution, which means votes holding at least 90% of the share value present at the general meeting, in person or by proxy. For an awning, BCA's guide says whether that vote applies depends on its design and how it's connected, and suggests having a Qualified Person or Professional Engineer certify it, which we arrange.
How much does a condo renovation cost?
Qanvast's January 2025 outlook, projected from the 2024 medians of 315 new and resale condo renovation projects on its platform, expected a new condo renovation to cost S$40,400 to S$51,500 and a resale one S$80,800 to S$105,000 in 2025. Those are that publication's projections, not our prices. What moves your bill is what comes out and what goes back in, such as hacking and carting away old tiles or walls, a toilet floor taken up and waterproofed again, rewiring, windows replaced, built-in carpentry, and an engineer's endorsement where your estate asks for one. The lift and corridor protection your estate asks for adds to it too. We give a fixed-price quote within 3 to 5 working days of a free site assessment, never from a photo. Our condo renovation buying guide goes through planning the whole job.
How long does a condo renovation take?
Qanvast's January 2025 outlook expected about 8 weeks for a new condo and 10 to 12 weeks for a resale one. That's a general expectation, not a schedule for your unit. Before work can start, allow for your estate's approval, and for an engineer's endorsement or the Commissioner of Building Control's approval where a wall or slab is involved. Noisy work like hacking can only happen in the hours your estate allows. We set the schedule with you once the scope and approvals are known.
What should I check about defects before renovating a new condo?
Report any defects you find before renovation covers or replaces them. During the Defects Liability Period, developers must resolve defects caused by substandard workmanship or defective materials under your Sale and Purchase agreement, which sets out which defects they're responsible for. Read the agreement's renovation restrictions too, as BCA advises. After the period ends, you may need to arrange and pay for repairs yourself, though a defect you reported during the period stays the developer's to fix.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Condo Renovation project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All condo renovation guides and articles →Read the condo renovation buying guide →
Chat on WhatsApp