Empty office unit ready to be fitted out, with a bare grey concrete floor, an open ceiling showing sprinkler pipes, aircon ducts and cable trays, full height windows facing other office towers, and a part unrolled floor plan with a tape measure on it beside a carpet tile sample board and a wood laminate sample board.

Offices, shops, eateries and factory units, fitted out or reinstated

Commercial Renovation

Get your office renovated or reinstated, your shop or food and beverage (F&B) unit fitted out, or works done in your factory unit by our specialists, with one contractor arranging and supervising every trade. We start with a free site assessment and send a fixed-price quote within 3 to 5 working days, never from a photo. We plan the job around your landlord's fitting-out rules, and where the work needs a Qualified Person or an engineer, we arrange one.

Why Choose Us

What You Get

One contractor for every trade in your unit

Partitions, ceilings, wiring, aircon, flooring, painting and hacking are each done by our specialist for that trade, and we arrange and supervise them all. You deal with one contractor instead of lining up several firms around your landlord's rules and working hours.

A fixed price after a free site assessment

We visit, measure and go through what you want done, then send a fixed-price quote within 3 to 5 working days, never from a photo. Have your landlord's fitting-out guide or building rules ready, so the quote allows for what they ask for, such as how the common areas are protected.

Qualified Person and engineer arranged where needed

The Singapore Civil Defence Force (SCDF) says fire safety works, such as moving sprinklers, fire alarm panels, exit signs or fire doors, need approved plans submitted by a Qualified Person, who is a registered architect or Professional Engineer, unless they're exempt or minor works that may go ahead after a lodgement. Where your works need one, we arrange the Qualified Person or engineer.

Reinstatement priced from your lease

When your lease ends, the lease and your landlord's requirements set what comes out and the condition the unit goes back in. Send us the reinstatement clause and your landlord's list, and we quote for taking out what has to go and making good what stays, then walk the unit with you before you hand it back.

One contractor for the whole job

The trades we handle

Electrical Works

The Electricity Act 2001 makes it an offence to do electrical work unless you're a Licensed Electrical Worker or supervised by one. Its exceptions, subject to any other written law, include replacing a lamp connected in your own installation. Under the Electrical Workers Regulations, and subject to the conditions on each licence, an electrician may work on installations of up to 1,000 volts and 45 kVA of approved load, and may install, repair, maintain and operate larger ones up to 500 kVA only under an electrical technician's supervision; a technician's licence covers installations of up to 1,000 volts and 500 kVA, and an electrical engineer's covers any installation.

Air-Conditioning

SCDF lists works involving air-conditioning or ventilation systems for non-residential use as fire safety works, which need its plan approval unless they're exempt or minor works that need only a lodgement.

Flooring

In an F&B kitchen, the Singapore Food Agency's (SFA) checklist asks for the floor to be graded to floor traps and coved where it meets the wall. Elsewhere, check what your lease says goes back.

Painting Services

Ask whether your landlord's fitting-out guide sets the colours or finishes before you choose. At the end of a lease, ask which colour and finish the walls go back in, so the repaint matches what the lease expects.

Hacking and Demolition

Hacking out partitions or finishes you added is part of a reinstatement where your lease asks for them to go. Structural works on a wall or slab need a Professional Engineer to apply for the Building and Construction Authority's (BCA) plan approval, and a permit before they start.

Landed, condo or commercial

For your kind of property

Offices

Moving partitions, adding meeting rooms or changing the ceiling can mean moving sprinklers or exit signs, or changing escape routes, which SCDF counts as fire safety works. We plan the job with that in mind and arrange the Qualified Person where the works need one, and our specialists do the partitions, ceiling, wiring, aircon and flooring.

Office reinstatement

Your lease and your landlord's requirements set what has to come out and the condition the unit goes back in, so check yours before you plan. Send us your lease's reinstatement clause and your landlord's list, and we quote from them, then walk the unit with you before you hand it back.

Shops and F&B units

Turning a unit to another use may need planning permission from the Urban Redevelopment Authority (URA), though in a shopping centre, switching between shop, showroom and restaurant needs none if URA's conditions are met. SCDF also gives a shop becoming an eating place as an example of a change of use that counts as fire safety works. A kitchen is built to the layout you submit to SFA.

Factories and industrial units

In JTC premises (JTC is the government agency that leases industrial land and space), all fitting-out and renovation works, temporary or permanent, need JTC's and the relevant authorities' approval before work starts, and you must engage a consultant for the application for JTC's consent. Where the works need a Qualified Person, we arrange one. Elsewhere, your landlord's fitting-out rules apply.

How It Works

Our Process

01

Free site assessment

We visit your unit, measure it and go through what you want done. We look for anything that needs a Qualified Person or an engineer, such as sprinklers, exit signs or fire alarm panels that have to move, or a wall or slab that may be structural. Have your landlord's fitting-out guide, your lease and the unit's floor plan ready if you can.

02

Get a fixed-price quote

We send a fixed-price quote within 3 to 5 working days of the site assessment, never from a photo. Check that it covers each trade, debris removal, the common area protection your building asks for and any Qualified Person or engineer the works need, so none of them turns up later as an extra.

03

Approvals before work starts

Your landlord's or building management's approval, and any change of use or business licence, are yours to apply for, and we give you the scope and the details of the work their forms ask about. Where the work needs them, we arrange the Qualified Person for SCDF's fire safety submission and the Professional Engineer for structural work. Work starts once the approvals your works need are in.

04

Our specialists do the work, and we supervise

Each trade is done by our specialist for it. By law, electrical work must be done by a Licensed Electrical Worker or under one's supervision. We supervise throughout, inside the working hours and rules your landlord or building sets, with the common areas protected the way those rules ask.

05

Hand over and keep the records

We walk the unit with you and try every light, switch, power point, tap, door and aircon unit before handover. The work comes with our warranty and after-care. Keep the approval letters and any certificates from the Qualified Person with your lease papers.

Common Questions

Commercial Renovation FAQ

Who applies for the approvals, me or the contractor?
Your landlord's or building management's fitting-out approval is yours to apply for as the tenant or owner, and we give you the scope and the details of the work the form asks about. SCDF's plans for fire safety works must be prepared and submitted by a Qualified Person on your behalf as the building's owner or occupier, and a minor works lodgement is made by a Qualified Person before work starts, with your landlord's or management corporation's consent. Where your works need one, we arrange the Qualified Person. In JTC premises, you must engage a consultant, who can be a Professional Engineer, registered architect or Qualified Person, for your application for JTC's consent.
Does a small office or shop renovation need approval?
Ask your landlord or building management first, because their fitting-out rules say what needs their approval. Beyond that, it turns on what the work touches. Under the Fire Safety Act 1993, anyone carrying out fire safety works must first get SCDF's approval of plans, and fire safety works include adding, moving or removing sprinklers, fire alarm panels, emergency exit signs or fire doors, and layout changes that affect escape routes. Works covered by the Fire Safety (Exemption) Order need no plan submission, and qualifying minor works may go ahead after a lodgement instead. Building works also need a permit from BCA, except insignificant building works listed in the Building Control Regulations. If you can't tell whether yours count, SCDF offers a free consultation, and the Qualified Person we arrange can advise.
Can work start before the approvals come through?
Not the work that needs them. Unless fire safety works are exempt or qualify for a minor works lodgement, SCDF's plan approval is required before they can begin, and in JTC premises all fitting-out and renovation works need approval from JTC and the relevant authorities before they start. If you're changing the use of the unit, URA advises you not to commit to a tenancy or renovation works before you receive its decision. For a food shop, SFA says you may go ahead with the renovation once it has approved your application, setting up the premises to the layout you submitted. We set the start date with you once the approvals your works need are in.
What does reinstating to original condition mean?
Whatever your lease and your landlord say it means, so read the lease's reinstatement clause and your landlord's handover requirements before you price the work, and ask for anything unclear in writing. If you hold a lease from JTC, you're required to reinstate your premises before returning them on the lease expiry date. JTC arranges a joint site inspection about 6 months before the lease expires, then tells you the reinstatement requirements, taking into account the obligations in your lease. If the reinstatement isn't finished before the expiry date, you're liable to pay JTC double rent from that date. Other leases and tenancy agreements set their own terms. We quote for the items your lease and your landlord list, such as partitions, ceilings, wiring or flooring you added, and walk the unit with you before you hand it back.
What drives the cost of an office renovation or fit-out?
What moves your bill is what the unit comes with and what has to change: partitions and ceilings, how much wiring, data and lighting is added, aircon and ventilation, a kitchen's exhaust, sinks and floor traps, anything that moves sprinklers or alarms and needs a Qualified Person, and the protection and working hours your building sets. A reinstatement is priced from what your lease says has to come out. We give a fixed-price quote within 3 to 5 working days of a free site assessment, never from a photo. Our commercial renovation buying guide goes through planning the whole job.
What makes two fit-out quotes comparable?
Both have to price the same work from the same layout, so give every contractor the same floor plan, list of works and your landlord's fitting-out guide. Then check that each quote prices every trade separately and says whether it includes debris removal, making good after the work, and protecting the common areas. That last one matters, because in JTC buildings repairs or cleaning in the common areas caused by the works are borne by you or your contractor. Check too whether each quote includes the Qualified Person's or engineer's fees and the authorities' fees, such as SCDF's plan fee, which SCDF's plan approval page, last updated in October 2026, puts at $90 per storey for a change of use or additions and alterations to existing fire safety works that add no floor area. A quote that leaves these out isn't cheaper, only shorter.
How long do the approvals for a fit-out take?
Each approval runs on its own clock, and your landlord sets its own. URA generally takes 10 working days to assess a change of use application, and it may take longer if the application is incomplete or other agencies have to be consulted. SFA reviews a completed food shop application within 7 working days. In JTC buildings, the facility management team's review of a permit to work typically takes less than 20 days from submission to decision. We set the schedule with you once the scope and the approvals are known, because both decide it.
What does an F&B kitchen need for its SFA licence?
SFA's food shop pre-licensing checklist sets out the design it looks for, so build to it from the start. It asks for a kitchen of at least 10 square metres excluding the servery, or 16 square metres if the food shop does catering; a floor trap in the food preparation area with the kitchen floor graded to it; coved edges where the walls meet the floor; walls of the preparation and servery areas lined with glazed tiles or another impervious material to not less than 1.5 m; at least one sink and one wash hand basin; and cooking fumes extracted and cleaned before they're released outdoors. Your licence application includes a scaled layout plan showing the kitchen equipment, exhausts, sinks and basins, and SFA's pre-licensing inspection, done virtually or from photos you send, comes after the renovation and before you open. Our specialists build to the layout you submit.

Have a different question? See all FAQs or WhatsApp us

Get Started

Discuss your project

Send photos and tell us what you want to change for your Commercial Renovation project. We can discuss what needs checking on site before a firm scope and quote.

Show the existing space and access
Explain the problem or change you want
Discuss the scope before agreeing to work
1
2
3
4

Your Contact Details

All commercial renovation guides and articles →Read the commercial renovation buying guide →
Chat on WhatsApp